User Tools

Site Tools


wiki:development:roadmap

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
wiki:development:roadmap [2015/02/05 08:53]
stefanbaur
wiki:development:roadmap [2015/02/05 08:53]
stefanbaur
Line 23: Line 23:
  
 At present, X2GoClient on OS X goes into an endless loop and has to be force-terminated after the second or third connection attempt. At present, X2GoClient on OS X goes into an endless loop and has to be force-terminated after the second or third connection attempt.
 +
 +Task assigned to: Mihai
  
 **Run multiple instances of X2GoClient**, or multiple sessions from one instance, all simultaneously (kind of how pyhoca-gui works) **Run multiple instances of X2GoClient**, or multiple sessions from one instance, all simultaneously (kind of how pyhoca-gui works)
wiki/development/roadmap.txt · Last modified: 2017/05/11 09:45 by stefanbaur