User Tools

Site Tools


events:tuebix-2017-planning

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
events:tuebix-2017-planning [2017/06/14 09:17]
stefanbaur [HP Tablet anschließen] - WinUpdates
events:tuebix-2017-planning [2017/06/23 12:41]
stefanbaur [Schedule] updated arrival time
Line 5: Line 5:
     * it is their responsibility to secure at least one, preferably two tables for us     * it is their responsibility to secure at least one, preferably two tables for us
     * Emergency Exits must not be blocked, not even with lightweight objects like the X-Banner     * Emergency Exits must not be blocked, not even with lightweight objects like the X-Banner
-  * Stefan#1 will hopefully arrive around 9:30 CEST+  * Stefan#1 will hopefully arrive around 8:45 CEST
   * Event starts at 09:30 CEST    * Event starts at 09:30 CEST 
   * Stefan's Talk is at 17:00 CEST and scheduled to last until 18:00 CEST   * Stefan's Talk is at 17:00 CEST and scheduled to last until 18:00 CEST
Line 45: Line 45:
   * Plakate in DIN A1   * Plakate in DIN A1
   * Werbematerial   * Werbematerial
 +
 +===== Stefan bringt folgendes Material mit ===== 
 +  * seinen Präsentations-Laptop
 +  * eventuell einen weiteren Laptop
 +  * neuen ThinClient mit Netzteil und Mickey-Mouse-auf-Schuko-Kabel
 +  * DisplayPort-Kabel und 2 DP->HDMI-Adapter
 +  * VGA-Kabel
 +
 ===== Wie läuft der Aufbau ===== ===== Wie läuft der Aufbau =====
  
events/tuebix-2017-planning.txt · Last modified: 2017/06/24 03:11 by stefanbaur